• 在线用户:554
  • 最高纪录:1842
  • 欢迎新会员:Scott99
货代之家 · 货盘信息 · 周游世界 · 环球娱乐圈 · 休闲咖啡屋 · 版务管理 · 版主之家· 贴图专区· 发图片帖

外贸职场论坛

外贸人职业规划、工作定位、职场体验、薪资调查、人际关系等在线交流

总版主:莫菲 版主:睿晖风中蜡烛冰点点   [ 版主管理 ]

·本贴被浏览:245 次

·本帖被回复:10 次

    楼 主

主题: 翻译,翻译,高手进来帮帮忙啊

  • 2008-04-26 13:17
  • 悬赏: 100积分 状态:

      是关于化学电镀磷化的一些要求与注意事项,有很多。先取一段,路过的人看看,帮我翻译下。很着急的...............万分感谢。

      H2.3.Procedure过程

      Conduct the neutral salt frog test described in ISO3768 for parts or small metal test pieces (H2.2) which have gone through post treatment.

      Note 12 – This test can measure the minimum expose time before the first observable corrosion mark of a corrosion resistance system.

      For this purpose, the test pieces shall be taken out of the test chamber by spells according to the prescribed frequency and visual check shall be conducted to locate corrosion marks. Whether the film or treatment layer of post treatment shall be removed before the visual check of parts or small test pieces can be clarified in a special agreement.

      For special phosphatised coatings, the time from the start of expose to the first corrosion mark of the test piece will vary greatly according to the different post treatment and coating grade. Therefore, the stipulations regarding the minimum expose time of phosphatised coatings that have gone through post treatment are specific according to the grade of anti septic oil, grease or wax. The coating quantity (in g/sqm) shall also be specified to determine the variance of weight.

      Note 13 – The minimum expose time and test method shall be determined by both parties through negotiation.

       

    • 标签:
      还没有签名
      第 1 楼

    回复:翻译,翻译,高手进来帮帮忙啊

  • 2008-04-26 15:26
    • 看了下,真的不懂.太专业了,真的爱莫能助哦.

      勇敢地笑出来,大声的说出来,因为我真的很快乐!!

      QQ:349171294

      第 2 楼

  • 2008-04-26 15:33
      家穷人丑一米四九/小学文化农村户口/破屋一间薄田一亩/一年四季药不离口/说明/革命道路并肩携手/问你愿否!
      第 3 楼

  • 2008-04-26 16:20
    • 高手呢?

      着急....

      还没有签名
      第 4 楼

  • 2008-04-26 17:31
    • H2.3.Procedure过程

      Conduct the neutral salt frog test described in ISO3768 for parts or small metal test pieces (H2.2) which have gone through post treatment.

      这句看不懂

      Note 12 – This test can measure the minimum expose time before the first observable corrosion mark of a corrosion resistance system.

      在耐腐性系统出现第一个可见的腐蚀标记之前,该测试可以测量出最小的曝光时间。

      For this purpose, the test pieces shall be taken out of the test chamber by spells according to the prescribed frequency and visual check shall be conducted to locate corrosion marks.

      为了达到这个目的,这些测试片需被带出实验室一段时间,根据规定的频率和目视检查来定位腐蚀标记的位置。

      Whether the film or treatment layer of post treatment shall be removed before the visual check of parts or small test pieces can be clarified in a special agreement.

       

      For special phosphatised coatings, the time from the start of expose to the first corrosion mark of the test piece will vary greatly according to the different post treatment and coating grade. Therefore, the stipulations regarding the minimum expose time of phosphatised coatings that have gone through post treatment are specific according to the grade of anti septic oil, grease or wax. The coating quantity (in g/sqm) shall also be specified to determine the variance of weight.

      Note 13 – The minimum expose time and test method shall be determined by both parties through negotiation.

       

      边走边唱
      第 5 楼

  • 2008-04-26 17:32
    • 没时间了,有时间再研究。

      边走边唱
      第 6 楼

  • 2008-04-28 17:19
    • 工夫不负有心人.你这100分悬赏我拿走了.哈哈哈...

      翻译如下:

      Conduct the neutral salt fog test described in ISO3768 for parts or small metal test pieces (H2.2) which have gone through post treatment.

       对已经通过后处理的件或小测试金属片(H2.2)实施在ISO3768中描述的中性盐雾测试.

      Note 12 – This test can measure the minimum expose time before the first observable corrosion mark of a corrosion resistance system.

      备注12-在抗腐蚀系统的第一个可见腐蚀标记前,该测试可以测量出最小暴露时间。

      For this purpose, the test pieces shall be taken out of the test chamber by spells according to the prescribed frequency and visual check shall be conducted to locate corrosion marks.

      为此目的,据规定的频率和目测来定位腐蚀标记位置的方法,这些小测试金属片需从实验室拿出来一段时间。

      Whether the film or treatment layer of post treatment shall be removed before the visual check of parts or small test pieces can be clarified in a special agreement.在零件或小测试金属片目测之前,后处理的涂膜或处理层是否应该除去可以在特殊协议中阐明.

       

      For special phosphatised coatings, the time from the start of expose to the first corrosion mark of the test piece will vary greatly according to the different post treatment and coating grade. Therefore, the stipulations regarding the minimum expose time of phosphatised coatings that have gone through post treatment are specific according to the grade of anti septic oil, grease or wax. The coating quantity (in g/sqm) shall also be specified to determine the variance of weight.对于特殊的磷酸盐涂层来讲,根据不同的后处理和涂层等级,暴露开始到测试件的第一腐蚀标记的时间将发生很大的改变.因此,关于已经通过后处理的磷酸盐涂层最小暴露时间的条款规定是明确的.这些条款规定是基于抗腐蚀油,润滑油或石蜡的等级来制定的.涂层质量(单位g/sqm)也应该明确说明以定义重量的变化.

      ALL POWER ON THE EARTH CANNOT CHANGE DESTINY.
      第 7 楼

  • 2008-04-28 20:54
    • 啊!厉害!我刚琢磨出一句呢

      勇敢地走
      第 8 楼

  • 2008-04-28 21:06
    • Conduct the neutral salt frog test described in ISO3768 for parts or small metal test pieces (H2.2) which have gone through post treatment.

      对通过处理后的零部件或小金属测试片进行ISO3768中所描述的中性盐雾试验.

      勇敢地走
      第 9 楼

  • 2008-04-29 13:14
    • 真是高手!!!!!!!!

       

      佩服!111111111111

      还没有签名
      第 10 楼

  • 2008-04-29 13:36
      还没有签名
    版权声明:本文为网友原创或转载,一切法律责任由发布人自负。本网站《服务条款》享有相关权利。 若该文侵犯了您的权利,请与本网站联络,我们将及时处理。
      快速回复:

    翻译,翻译,高手进来帮帮忙啊

    注意:您还没有登陆,请登陆后发贴或回复!  
    用户名: 密 码:
    世贸人才网简介 | 企业服务 | 个人服务 | 意见反馈 | 法律声明 | 网站地图 | 联系我们 | 网站日志
    Copyright © wtojob.com. All Rights Reserved. 京ICP证050883号