• 在线用户:1088
  • 最高纪录:1842
  • 欢迎新会员:中期年
货代之家 · 货盘信息 · 周游世界 · 环球娱乐圈 · 休闲咖啡屋 · 版务管理 · 版主之家· 贴图专区· 发图片帖

商务外语论坛

外贸过程中的各种专业词汇及翻译问题,英语及其他语种的在线交流

总版主:莫菲 版主:☆追风の者☆   [ 版主管理 ]

·本贴被浏览:349 次

·本帖被回复:6 次

    楼 主

主题: 奥运"鸟巢","水立方"怎么译,才地

  • 2008-02-28 10:49
    • 奥运"鸟巢","水立方"怎么译,才地道?  谢谢!!

    • 标签:
      还没有签名
      第 1 楼

    回复:奥运"鸟巢","水立方"怎么译,才地

  • 2008-02-28 15:48
    • Bird's nest

      Water cubic

      Chinese English, OK?????????????????????

      To err is human, to forgive is divine.

      第 2 楼

  • 2008-02-28 17:55
    • Beijing National Stadium (Bird's Nest/Olympic Stadium)


      The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.

      In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.


      In depth
      The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.

      The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.

      Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.

      While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.

      The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.

      百度搜的,参考一下

      第 3 楼

  • 2008-02-28 17:59
    • National Swimming Center--Exquisite and Exciting "Water Cube"

      A semi-transparent "cube", with "bubbles" spread out all over its surface, is a shape very similar to the structure of "H2O", the outlook for the National Swimming Center at the 2008 Olympic Games. After the games, it will become a recreational water park open to the public.

      In Chinese culture, water is an important natural element. It creates a calming atmosphere and inspires happiness. Taking full consideration of the functions of water in recreation and bodybuilding, designers have explored many ways for people of different age groups to appreciate its function. The design is called "Water Cube". Many creative designs have been employed in the creation of the swimming pools at the swimming center. Other high-tech facilities including optical devices used to define positions of athletes, and multiple-angle, three-dimensional screening systems are provided to help spectators enjoy competitions.

      The National Swimming Center, one of the three landmark buildings for the 2008 Beijing Olympic Games, is located inside the Beijing Olympic Park. Covering a total floor space of 50,000 square meters, it has 17,000 seats. The project costs about US$100 million. The center will be a venue for swimming, diving, synchronized swimming and water-polo games during the period of the Olympic Games. After the games, the center will become a large water recreational center open to the public.

      In January 2003, Beijing started to solicit design schemes for the National Swimming Center. The international competition settled on "Water Cube" as the winning scheme. It is designed by the design consortium consisting of the China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co Ltd, PTW Architects (Australia) and Ove Arup (Australia).

      The National Swimming Center will be the only landmark Olympic venue that is constructed by donations from compatriots from Overseas.

      还是百度搜的

      第 4 楼

  • 2008-02-28 18:59
    •    飕飕~~

      还没有签名
      第 5 楼

  • 2008-03-05 16:34
    • 开了眼了。

      还没有签名
      第 6 楼

  • 2008-03-05 17:44
    • The Bird's Nest.鸟巢

      Water Cube.水立方

      还没有签名
    版权声明:本文为网友原创或转载,一切法律责任由发布人自负。本网站《服务条款》享有相关权利。 若该文侵犯了您的权利,请与本网站联络,我们将及时处理。
      快速回复:

    奥运"鸟巢","水立方"怎么译,才地

    注意:您还没有登陆,请登陆后发贴或回复!  
    用户名: 密 码:
    世贸人才网简介 | 企业服务 | 个人服务 | 意见反馈 | 法律声明 | 网站地图 | 联系我们 | 网站日志
    Copyright © wtojob.com. All Rights Reserved. 京ICP证050883号